"Mr President, President-in-Office of the Council, Vice-President of the European Commission, ladies and gentlemen, we are examining two instruments: a regulation and a decision on migration from SISone4ALL to SIS II, including a comprehensive test that will assess whether the level of performance of SIS II is equivalent to that of the current system. These proposals are the result of a change in the migration strategy.
Four points: firstly, the initial plan was to have a migration of 15 Member States in a process lasting around 8 hours. In the meantime, the number of Member States increased to 25, which made the process much more complex and difficult. Secondly, an interim technical architecture will have to be created that will allow SIS1+ and SIS II to operate in parallel for a limited transitional period. This is a wise solution that we should agree to and it will enable us to have a fallback in the event of something going wrong. Thirdly, a technical tool – a converter – will be made available during this interim period that will connect the SIS I central system to the SIS II central system, enabling both to process the same information and ensuring that all Member States stay on the same level. Lastly, the mandate given to the Commission in 2001 expires at the end of this year.
We raised four concerns. Firstly, the need for the European Commission to continue to have a mandate to develop SIS II until it is operational. We are opposed to the idea, which was considered, of the Commission’s mandate finishing when work on the C-SIS central system is concluded. Secondly, for there to be a clear definition of the European Commission’s competences and of those of the Member States. Thirdly, that all the conditions laid down in No 2 establishing the legal basis for SIS should be fulfilled before the migration of the data takes place. Lastly, that this migration should be carried out in a single, one-shot phase, processed by all Member States.
The proposals we received on 3 September, on the same day that they were approved in Coreper, make major changes to the initial proposals. Normally Parliament should be consulted again when the texts presented involve substantial changes. However, once again, we are up against a tight schedule; the Commission’s mandate expires at the end of 2008 and it is essential that the Council approve these proposals at the end of October. Once again Parliament is showing it is living up to its responsibilities and it is not our fault that the process is delayed. As a matter of fact, the changes that have been made do answer most of the concerns outlined in my draft reports, especially in terms of clarifying the Commission’s responsibilities and those of the Member States and that the Commission will continue to have a mandate to develop SIS II until it is operational.
In conclusion, I should like to congratulate the French Presidency on the excellent work it has put into achieving a good agreement between the Commission and the Member States, which had looked as if it was going to be difficult. The European Parliament wants to contribute to avoiding further delays and to having SIS II operational by the new date set: 30 September 2009. We are, however, concerned, as various experts have said informally that it is more than likely that this date will once again not be respected.
There are two essential points that the European Parliament considers as key and that all the political groups support. Firstly, that the European Parliament should be updated on a six-monthly basis on the development of the project and, secondly, that the mandate given to the new Commission should not be an open-ended mandate and that a rule be included whereby the European Parliament has to be consulted again if there is a delay of more than one year. We sincerely hope that this time the project will be concluded in a timely fashion and that SIS II can start operating on the scheduled date."@en1
|